无码人妻毛片丰满熟妇Av片,欧美日本黄色,欧美黑人又大又长,午夜精品亚洲日日做天天做,黄色视频在线播骚,开心色播四房,国产又粗又猛又大又黄,无码成人在线,XXXXX又大又粗又硬又爽毛片,无码无卡高清视频

Company News

Installation and commissioning of 110KV booster station of Ningxia China Resources Haiyuan 200MW Wind Power Project

AddTime:2020-08-20 15:07:34   Views:     【 Big Mid Small 】   Print   Close

 Recently, the staff of the engineering and technology department of our company went to Haiyuan County, Ningxia to carry out the installation of the 110KV booster station of the 200MW wind power project. This project includes: 1. Installation and commissioning of equipment and accessories. 2. Cable laying and connection. 3. Grounding production and connection and other related work, our company strictly in accordance with the construction drawings, construction technology and related technical specifications for construction. At the same time, high-voltage electrical test technicians carry our company's self-produced high-voltage equipment for preventive transformer tests. Due to the large workload, our company staff work overtime to complete the work ahead of schedule.

It is reported that the engineering and technical personnel of our company ensure the safety management of the construction site and clarify the safety responsibilities to ensure the safe and smooth completion of the engineering tasks. At the same time, our company is equipped with professional technicians and complete sets of high-efficiency high-voltage instruments, which can carry out various high-voltage tests on major substations and power distribution rooms.


Back To Top

Mobile station QR code
Copyright ? Baoding Yuanchuang Electric Power Co., Ltd. All Rights Reserved